ClaudeMods
☰
ZH-CN
● 0 人在线 · 浏览 0 次
赞助提交作品
GitHub 仓库 · 发布者 3dnow

weektoken

WeekToken 将 Claude Code 速率限制的已用量与窗口已过去的时间并列,告诉你是在时钟前面还是后面,并涵盖 5 小时窗口、7 天窗口和 Fable 等按模型计算的每周配额。

已翻译

关于这个 mod

会在重置前用完吗?WeekToken 将 Claude Code 速率限制的已用量与窗口已过去的时间并列,告诉你是在时钟前面还是后面。它涵盖 5 小时窗口、7 天窗口和 Fable 等按模型计算的每周配额。功能包括基于速度而不是原始百分比的评分、按模型配额、预测与消耗历史、提示符上方的状态带,以及带速度环和消耗图表的完整 /weektoken 面板。不需要配置;会根据 Claude Code 的语言支持英语和中文。数据来自会话自身的速率限制、~/.claude.json 的 cachedUsageUtilization、手动刷新时可选执行的本地 claude -p /usage 调用,以及可选的 WeekToken macOS 应用历史文件。需要 Claude Code 2.1.287 或更高版本和 Claude 订阅。

安装

请先查看作者 README 确认 marketplace 和插件名称;命令可能随仓库结构改变。

claude plugin marketplace add 3dnow/claude-mods
claude plugin install weektoken
原文 / README

WeekToken

Will you run out before the reset? WeekToken puts what you have used of Claude Code's rate limits next to how much of the window has passed, and tells you whether you are ahead of the clock or behind it. It covers the 5-hour window, the 7-day window and per-model weekly quotas such as Fable.

The WeekToken band above the prompt

  • Pace, not just a percentage. 64% used means little on its own; 64% used with 71% of the week gone means you are fine. The band and the pane show both, colored by pace.
  • Per-model quotas. Fable and other models with a weekly limit of their own get their own pace, next to the 5-hour and 7-day windows.
  • A forecast and a history. "At this rate, runs out ~Sat 20:12", plus a burn-up chart that lays past windows under this one, so you can see how this week compares.
  • Nothing to set up. No settings; English or Chinese, following Claude Code's language; desktop app and terminal.

| /weektoken pace | Burn-up history | | --- | --- | | Pace rings, forecast and readings | Burn-up chart with past windows |

In the terminal, the band sits above the prompt and /weektoken docks beside the conversation:

WeekToken in the terminal: the pane docked on the right, the band above the prompt

Features

A band above the prompt: ❮ 7-day ❯ · 64% used · 71% elapsed, a progress bar that stretches with the band, plus Details and Hide (in the desktop app, Hide is the close button at the band's right end).

  • The bar stays in the quota's own color, like Apple's Activity rings. Using slower than time: light stripes of that color after the bar are the margin you have left. Using faster: the part ahead of the clock turns a deeper shade of the same color, striped. Only when a quota is used up does a warm tone appear, harmonized toward the quota's color.
  • Shows the tightest quota by default. The arrows around the name switch to another quota, and the choice is remembered across sessions.
  • On a narrow band the line never wraps: the desktop app truncates from the end; in the terminal the line is laid out by its real width, dropping the elapsed figure first and then the bar.
  • When a quota's window has passed its reset time and no reading of the new window has arrived yet, the band says reset instead of showing the old window's usage.
  • Hide asks first and tells you how to get the band back: /weektoken show, or ⊕ Show band at the bottom of the pane.

The /weektoken pane:

  • Pace rings: the outer ring is usage, the inner ring is time, and the center is the burn rate R (1.0 means you run out exactly at reset). The buttons on either side switch between the 5-hour window, the 7-day window and per-model quotas such as Fable.
  • Narration and forecast, e.g. "Usage 12h 28m behind the clock", "At this rate, runs out ~Sat 20:12"; an extra line when you have been speeding up or slowing down lately.
  • Three readings: used, elapsed, time to reset.
  • Burn-up chart: this window, the last month or everything, with older windows a step away; an even-pace line, the projection at the recent rate, when you would run out, and stretches without data, with the legend drawn inside the chart. When a range holds more than 60 windows, 60 evenly spaced ones are drawn and the caption says so.
  • Footer: "Last used Fable 3h ago" when a quota has not moved for half an hour, ⊖ Hide band / ⊕ Show band and ↻ Refresh. While refreshing, the button reads Refreshing…; a notice appears only if /usage could not run.

Colors follow pace, not the raw percentage: the over-pace thresholds are Claude Code's own rate-limit warning calibration (five_hour: 0.9/0.72; seven_day: 0.25/0.15, 0.5/0.35, 0.75/0.6) and tighten as the window goes on.

Where the data comes from

| Source | Content | |---|---| | The session's own rate limits | The 5-hour and 7-day windows, updated after every reply | | cachedUsageUtilization in ~/.claude.json | Claude Code's own usage cache, including per-model quotas (Fable and others) | | Local claude -p --no-session-persistence /usage (only when you press ↻ Refresh) | Fresh per-model quotas; also the 5-hour and 7-day windows when there is no local reading from the last 10 minutes (a new session before its first reply) | | ~/.weektoken/samples.jsonl (optional) | History from the WeekToken macOS app, imported read-only |

Samples are kept in the mod's own cross-session store, up to 8000; the oldest go first. Sessions open at the same time merge their samples and keep one copy of each reading. Without history to import from the WeekToken macOS app, history starts when you install the mod, since the API only reports current values.

A quota you are not using does not change, so old data still gives a valid pace.

Commands

| Command | Does | |---|---| | /weektoken | Opens the pace pane | | /weektoken hide | Hides the band (kept across sessions) | | /weektoken show | Shows it again |

Configuration

Nothing to configure. Two environment variables override the defaults; set them in your shell profile (e.g. ~/.zshrc) and start a new session:

| Variable | Effect | |---|---| | WEEKTOKEN_LANG | zh or en forces the interface language. By default it follows Claude Code's language setting, then the system language | | WEEKTOKEN_HISTORY | Path of the WeekToken macOS app's history file; an empty string turns the import off | | CLAUDE_MODS_DISABLE | all, or a comma list containing weektoken, turns the mod off entirely |

Privacy and permissions

Mods run with the same access as Claude Code itself and are not sandboxed. This is everything WeekToken does besides drawing its own band and pane.

What it sends, and where

WeekToken itself makes no network calls, and nothing it reads is sent anywhere. The only request that leaves your machine is made by Claude Code, not by the mod: when you press ↻ Refresh, the mod runs Claude Code's own /usage command (below), and Claude Code looks up your usage at Anthropic's usage endpoint (/api/oauth/usage) with the login it already has. No model is called and no quota is used; checked with claude --debug-file.

Programs it runs, and why

Every command is fixed text, and none goes through a shell.

| Command | When | Why | | --- | --- | --- | | claude -p --no-session-persistence /usage | Only when you press ↻ Refresh | The only fresh source for per-model quotas such as Fable. The mod looks for claude on your PATH, then in ~/.local/bin, ~/.claude/local, /opt/homebrew/bin and /usr/local/bin. It saves no session. | | defaults read -g AppleLanguages | At session start, and when you change Claude Code's language | Reads the macOS language when Claude Code's own language setting is not set (macOS only). | | tail -n 8000 ~/.weektoken/samples.jsonl | At session start and every 10 minutes, only if the file exists | Imports history from the WeekToken macOS app. | | perl, with one fixed pattern and no shell | Only when ~/.claude.json is over 4 MiB and can't be read directly | Extracts just the cachedUsageUtilization entry from that file and prints it back to the mod; nothing else is read or sent. |

What it reads on your machine

  • ~/.claude.json, Claude Code's own file. Only its cachedUsageUtilization entry is used: Claude Code's usage cache, which includes per-model quotas. The file also holds account details; those are not used or kept. It is read at session start, every 5 minutes when the file has changed, and on Refresh.
  • ~/.weektoken/samples.jsonl, or the file named by WEEKTOKEN_HISTORY, if it exists.
  • Environment variables: HOME and PATH (to find the files and claude above), LANG, LC_ALL and LC_MESSAGES (the language), WEEKTOKEN_LANG, WEEKTOKEN_HISTORY and CLAUDE_MODS_DISABLE. It reads no credentials.
  • From Claude Code: the session's rate-limit figures, the time and model of each reply, and the language setting.

What it stores

In the mod's own store on your machine: samples (up to 8000) and their version stamp, when each model was last used, whether the band is shown and which quota it shows, the quota selected in the pane, the modification time of the imported history file, and whether the welcome notice was shown. The interface language is detected each session, not stored.

Hooks

| Hook | What it does | | --- | --- | | session.start | Registers /weektoken, loads the stored samples, reads the sources above and starts the 1-, 5- and 10-minute timers | | session.measure | Records the session's 5-hour and 7-day figures when they change | | turn.complete | Records the time and model of each reply, to tell when a quota was last used | | command.run, /weektoken only | Answers its own command: opens the pane, or shows or hides the band | | ui.render, AbovePrompt | Draws the band, then whatever other plugins or Claude Code draw there, below it | | ui.render, the weektoken pane only | Draws the /weektoken pane | | ui.press | Notes presses on its own pane and passes every press on unchanged | | ui.focus | Passes the event on unchanged. On its own pane in the desktop app, when a click only moved the focus to a button (the first click on an unfocused pane), it runs that button's action | | config.set, language only | Passes the change on unchanged, then detects the interface language again |

It changes no settings or permissions, and it leaves other plugins' events as they are.

Requirements

  • Claude Code 2.1.287 or newer, where mods are on by default. On an earlier build with mods in early access, add "env": { "CLAUDE_CODE_ENABLE_FUNCTION_HOOKS": "1" } to ~/.claude/settings.json first
  • A Claude subscription; sessions billed by API key have no rate limits

Development

claude plugin validate .
claude plugin test

Author

mj0111 · @mj0011sec on X

更多类似作品