---
title: "mission-control"
url: "https://claudemods.dev/en/builds/mission-control-eb1814"
source: "https://github.com/eshin087/claude-code-mods/tree/main/mission-control"
source_type: "github"
repo: "https://github.com/eshin087/claude-code-mods/tree/main/mission-control"
author: "eshin087"
author_handle: "eshin087"
stars: 0
category: "Dashboards & HUD"
categories: ["hud"]
tags: ["dock", "estimate", "hud", "mission-control", "planning", "progress"]
permission_level: 2
scan_complete: true
install: "claude plugin marketplace add eshin087/claude-code-mods\nclaude plugin install mission-control"
added: "2026-10-05T01:53:25.101Z"
updated: "2026-11-14T04:38:40Z"
locale: "en"
content_locale: "en"
---

# mission-control

Live plan, % done, time left and a one-line 'now' for long tasks, in a pane and on the working row.

## Description

Mission Control is a Claude Code mod that shows a live progress view for long tasks: the plan, percentage done, time elapsed, time left, and a one-line summary of what Claude is doing right now. It surfaces this in the dock above the prompt, on the "Working…" row, and in a togglable pane via the plan command or `/mission`, which also shows a checklist and a timestamped "Trail" of recent activity. It registers a `mcp__mission-control__plan` tool so Claude can post a 3-8 step plan for tasks with 3+ steps or over ~2 minutes and update it as steps start and finish. The mod computes percentage done from finished step sizes plus partial credit for the current step, and time left from remaining size multiplied by a pace blended from this task's finished steps and prior tasks in the same project. Only active time counts, and early estimates are noted and calibrated over the project's last 20 tasks so accuracy can be reported. Cost is a short hidden reminder (~60 tokens) per prompt plus small tool calls, and data is saved to `~/.claude/mods-data/mission-control/<session>.json` for calibration and scoring.

## Install

```
claude plugin marketplace add eshin087/claude-code-mods
claude plugin install mission-control
```

## Original README

# Mission Control

**What it does:** a live progress view for long tasks: the plan, % done, time elapsed, time left, and one line on what Claude is doing right now. It replaces scrolling through verbose updates.

**Where you see it:**
- **The dock** (Mod Hub's line above the prompt): `◎ 64% ⣿⣿⣿⣿⣷⣀⣀ 3/5 ~8m — <now>` while working, then `✓ done 6m53s` until your next prompt.
- **The "Working…" row** shows the same while Claude works.
- **Plan** in the dock (or `/mission`) toggles a pane with the checklist (✓ done with time taken, ▶ current, ○ to do) and a **Trail**: the last "now" lines with timestamps, a condensed history of the work.

**How it works:** the mod gives Claude a tool, `mcp__mission-control__plan`. For tasks with 3+ steps or over ~2 minutes, Claude posts a plan (3-8 steps, each sized 1-3), then updates it as steps start and finish. The mod does the maths:
- **% done** = finished step sizes + partial credit for the current step.
- **Time left** = remaining size × pace. Pace comes from this task's finished steps, blended with your earlier tasks in the same project.
- Shown as **≈** ("rough") until a step finishes or history exists.
- Only active time counts. Time waiting for you between turns does not.

**How accurate is it?** Every time the board shows a time left, the mod notes it. When the task finishes, it compares each guess with the time that was actually left and keeps the median miss (a guess of 4m when 2m were left is 100% off; a 1-minute floor stops the last few seconds from skewing it). **P** then shows *Past estimates: off by ~X% on average (N tasks)*, averaged over the project's last 20 tasks. Expect early guesses to be off by 2-3×; they tighten once a step or two finishes, and as the project builds up history.

**Cost:** a short hidden reminder (~60 tokens) is attached to each prompt you send, plus a few small tool calls per task. No extra model calls.

**Data saved:** `~/.claude/mods-data/mission-control/<session>.json`: finished tasks' size, duration and estimate miss, used to calibrate future estimates and to score them.

**Limits:** the estimate is only as good as the plan. If scope grows, Claude adds steps and the % drops. It's an estimate, not a promise.
